|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | 3 Year |
| Warranty: | 3 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

| Length 500mm | Length 750mm | Length 1000mm | |
| Service Area | 0.5-1.5 m2 | 0.75-2.25 m2 | 1-3 m2 |
| Bubble Size | 1-2mm | 1-2mm | 1-2mm |
| Perforation Size | 1mm | 1mm | 1mm |
| Perforation Quantity | 17000 | 17000 | 17000 |
| Membrane Thickness | 1.7-2mm | 1.7-2mm | 1.7-2mm |
| Temperature | 0-80ºC | 0-80ºC | 0-80ºC |
| Resistance Loss | 1900-3000 pa | 1900-3000 pa | 1900-3000 pa |
| Oxygen Utilization | 27%-38% | 27%-38% | 27%-38% |
| Air Flow | 1.5-5 m³/h | 2.25-7.5m³/h | 3-10 m³/h |
| Material | EPDM/Silicone | EPDM/Silicone | EPDM/Silicone |
| Diameter | φ63/φ65/φ90 | φ63/φ65/φ90 | φ63/φ65/φ90 |




Willmore is a professional Rubber&Construction manufacturer in China. The factory is located in Jiangsu, closed to Shanghai. After 15 years of development, it has a mature production system, a professional engineering team, a quality inspection department and a strong production line, providing a one-stop design scheme and product design for customers in many countries.
Q1. What is your terms of packing?
A: Generally, we pack our goods in Blank Cartons. We privode carton LOGO print service after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before after receive the copy of B/L. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: We accept FOB,CIF,CNF,DDP,DDU,LC.etc
Q4. How about your delivery time?
A: Generally, it will take 7 to 10 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. What is your sample policy?
A: We can supply the sample for free, client only need to pay the delivery cost.